KnowledgeCapital

KnowledgeCapital › Docs

Your first hour: a first real diagnosis

From an empty space to a first answer: one process, its tasks, its knowledge and who holds it. Six steps to see your knowledge at risk in one hour.

In short. In one hour you get a real answer by mapping a single process, completely: its structure, its weighted tasks, five or six people, the knowledge it requires, then each person's mastery level. The “Knowledge at risk” screen then shows the high-criticality knowledge and the real number of its holders.

Resist the urge to map everything. The fastest way to see whether this tool is useful to you is to map one process you are already worried about, completely, and look at what comes out.

1. Create your structure

In Org chart, create the site or department that owns the process. The hierarchy is: Structure → Process → sub-process, as deep as you need.

2. Declare the process and its tasks

In Processes, create the process and break it into tasks, each with a weight. The weights are what make the process score meaningful — a task that represents 40% of the work should not count as much as one that represents 5%.

3. Add the people

In People, add the individuals who actually run that process. Five or six is enough for a first pass. You can import a list later.

4. Declare the knowledge

In Competencies & knowledge, attach competencies to the process, and knowledge to the competencies. Write them as a practitioner would say them aloud — "restarting the line after an emergency stop", not "operational procedures".

5. Assess mastery

For each person and each piece of knowledge, set a mastery level from 0 to 5: in Skills & Knowledge, click a knowledge item then Declare a holder — or, from a person's profile, Assign. The link is direct, without going through a task. This is the step people want to skip, and it is the only one that cannot be skipped: without it, availability cannot be computed, and criticality means nothing.

6. Look at the result

Open Knowledge at risk. What you should see: a short list of items where the criticality is high — and, next to each, the number of people who actually hold it. If that number is 1 anywhere, you have found something worth a meeting.

What a good first hour produces. Not a complete map. One process, honestly assessed, and two or three uncomfortable facts you did not have in writing this morning.

Knowledge loss risk: the age pyramid and the departure schedule, computed from the records — not estimated.
Knowledge loss risk: the age pyramid and the departure schedule, computed from the records — not estimated.
Do the exercise in the trial spaceThe demonstration organisation shows the expected result; after “Start from scratch”, you repeat the six steps on a real process. Start a free 14-day trial (no card needed) or request a demo.

See also: Free 14-day trial and pricing · Import your data and connect your systems · Knowledge criticality: how it is computed · How to build a knowledge management system from scratch · Skills mapping: method and software

Frequently asked questions

Do we have to map everything before seeing a result?

No. A single process, honestly assessed, already produces useful findings. You then extend, process by process.

Which step cannot be skipped?

The mastery assessment. Without it, availability cannot be computed and criticality means nothing.

Where do we see the result?

On the “Knowledge at risk” screen: high-criticality knowledge with, for each item, the number of people who actually hold it.

Docs

Getting started